Evolution™

A conventionally styled, insulated sports facility built with a modern architectural approach

This unique building technique utilises a modular steel framed superstructure which allows for versatility in design to create an innovative sports facility for use as a sport specific centre of excellence or ideal for schools, colleges and universities for use as a multi sport facility.

Request further information

Request further information

Features

  • j Design - Every Evolution is designed from the inside, out to ensure the layout, specification and equipment meets both your sporting requirements but those of the appropriate governing bodies and regulations
  • j Wide, Clear Span - Evolution buildings utilise our clear span steel superstructure, capable of spans of 80+ metres. Buildings are CE Marked and designed in accordance with UK Building regulations
  • j Customisation - The roof is clad with either aluminium, steel or slate effect cladding to give both a very long life and attractive appearance. For the walls you can choose from our range of material finishes to achieve the desired appearance whether it is to create a visually stunning façade or match existing materials on your site. Options include glazing, aluminium, steel, timber cladding, render or coloured architectural panels
  • j Ancillary Accommodation - Its more than just a sports hall, internally Evolution can accommodate ancillary rooms allowing everything to be under one roof with changing rooms, shower facilities, fitness suites, offices and viewing balconies popular choices to complete the new facility
  • j Building Services - With a range of Energy efficient options for heating, ventilation, lighting & environmental control systems the Evolution can help reduce your carbon footprint and energy overheads whilst complying with building regulations, planning requirements or your own Environmental targets
  • j Flooring & Equipment - With an extensive selection of sports surfaces and equipment to choose from, the facility is designed to ensure the facility is equipped ready to use

Aysgarth School, Multi use Sports Facility

Client: Aysgarth School, Bedale, Yorkshire
Scope of work: Design and build of Evolution sports facility with reception area, elevated viewing balcony, changing facilities, shower facilities and internal fit out.
Dimensions: 34m x 22m x 6.6m

Gordano School, Multi use Sports Facility

Client: Gordano School, Portishead, Bristol
Scope of work: Design and build 4 court Evolution multi sport facility with integrated gym, changing and shower facilities
Dimensions: 37m x 24m x 12m | Annex 24m x 9m

  • The team demonstrated a strong passion for quality with good systems in place for accepting various elements of work with any non-conformities being swiftly rectified.

    The site teams themselves were all hard working and dedicated team players that were a pleasure to work with and I look forward to working with Collinson again in the future.

    Steve Lee, - Project Manager, Kier Group
  • Throughout the contract Collinson were diligent and professional in their approach to their works within a live school environment.  The site team respected  the school environment that they were in, which was evident by the consistent standard of PPE worn by all operatives and maintenance of plant and equipment.

    The very narrow site access was shared with the school but with good planning and site controls all deliveries went like clockwork. All risk assessments, method statements, safe systems of works and fit for work certification were produced on time.

     

    Steve Lee, - Project Manager, Kier Group
  • 'Collinson are by far the best company we have ever worked with, we were barely aware that a new building was undergoing construction. Antony, the project manager held regular meetings to keep us up to to date on progress. The attention to detail on the financial tracking side of the project was spot on and ensured the project was delivered on time, and within budget.’

    A cost effective sport and teaching hub for Chauncy School - Wendy Bremner, Business Manager, Chauncy School
  • "We are more than happy with our fantastic new facility! It brings the students a wealth of opportunities to try new sports which is a great benefit to the College."

    Marie Black, Business Manage, St Francis Xavier's College, Liverpool
  • "We now have a top-class building that delivers a superb facility for cricket in our area. It is truly a centre of excellence and we have achieved something all cricket clubs aspire to"

    Alan Budge, Vice Chairman Eversley Indoor Cricket Facility, Eversley, Hampshire
  • “An outstanding facility”

    Devon Malcolm - former England cricketer
  • "I am very proud of what we have here and I know Collinson are too, people say would I use Collinson again, definitely, I would also highly recommend them, we had an honest relationship and the result, an outstanding facility which offers the boys a wealth of opportunities"

    Andrew Francis, Estates and Finance Manager, Aysgarth School, North Yorkshire
  • "Collinson minimised any disruption to the program and did an outstanding job with planning the sequencing of work and handling the logistics. Health and Safety was firmly integrated into their work practice and always evident on site. I would recommend their participation in any construction process”

    Christopher Wynne - Christopher Wynne, Wynne Construction, Principle Contractor for Parc Eirias, Cardiff
  • “The new Rugby Academy at Parc Eirias was a very challenging project taking place within extremely tight timescales. Collinson consistently demonstrated a professional and collaborative way of working throughout the process from tender to completion. They established good communication channels between all the parties involved"

    Christopher Wynne - Wynne Construction, Principal Contractor for Parc Eirias, Cardiff
  • “We have been delighted with all aspects of our new sports hall. Collinson have been highly professional throughout and have delivered a sports hall that is remarkable value for money. I would fully recommend Collinson to any school that is considering a new sports facility”

    Phil Grace - Headteacher, St Bede's High School, Lytham St Annes
  • "The completed MugaCova is marvellous! It is in constant use and a great asset to the school. Having a covered games area gives the sports staff the extra flexibility they needed when doing PE and games during bad weather. The build quality is excellent and all who use it are impressed - the overall appearance of the Mugacova only serves to enhance our site and facilities”

    Mick Bold - Facilities Manager, The Charter School, London
  • “We are all delighted with our new sports hall. From start to finish Collinson have been a truly professional company to work with and have delivered our project on time and within budget. We have also already had a number of local heads of PE asking to look around as they cannot believe we have managed to get a sports hall of such high quality built so quickly within such a limited budget”

    Wendy Gooding - Director of Sport, Stanground College, Peterborough
  • “I can’t speak highly enough of Collinson, they were spectacular contractors.  As we are going through a BSF build we were forever grateful Collinson were so good.  Monthly site meetings ensured everything ran smoothly and didn’t create additional headaches.  The school is absolutely over the moon with the facility, the student’s jaws dropped in amazement when they walked in”

    Ian Johnson - Business Manager, Soar Valley College, Leicester
  • “It’s a very impressive structure – bright, airy and the ambience is excellent”

    Gerry Kelly - General Manager, Planet Soccer, Drogheda Leisure Park, Ireland
  • “Membership at all levels has increased greatly since we opened, the wow factor is unbelievable”

    Mandy Stonier - Tennis Development Officer, Writhlington Tennis Centre, Avon
  • “We are delighted to have this outstanding facility which will transform the sporting opportunity for our pupils and the local community”  

    Mark Hitch - Deputy Headteacher, Humphrey Perkins School, Loughborough
  • "Collinson have worked with William Edwards School & Badminton England over the past two years to design, plan and then construct a world class sporting facility. The support given by all staff at Collinson has been immense with a designated project manager to oversee the works. Would highly recommend this company and am happy to show anyone the facility and speak about the company if schools wish."

    Peter Melville, William Edwards School, Grays, Essex
  • "Collinson have been a pleasure to work with. Professional from start to finish, with excellent communication and collaboration with the University and Kent Sport."

    Ben Trott, Assistant Director - Operations, Kent Sport, University of Kent
  • Surf Snowdonia was a fast-paced, commercially critical project and we needed to select a delivery partner for our tensile building who could not only work autonomously but who we were confident could produce the right quality product in a timescale fit our tight programme. Collinson achieved this and helped deliver the world’s first stadium surfing venue.

    Gavin Garner, Director, WCP Associates

At Collinson we like to keep things simple and make the process of building your facility as straight forward as we possibly can

Step 1 - Contact Collinson

Step 1 - Contact Collinson

If you think a Collinson building could be just what you're looking for then give our friendly team a call. You'll speak directly to one of our construction team, ready to discuss your individual requirements. No sales waffle, just dedicated and knowledgeable national account managers.

Step 2 - Arrange a site visit

Step 2 - Arrange a site visit

Your own dedicated account manager will arrange a visit to view the site and discuss your requirements, ideas and explain about our range of buildings and their key features.

Step 3 - Collinson proposal (pre-planning)

Step 3 - Collinson proposal (pre-planning)

When we feel confident we fully understand your requirements our architectural design team will put together an initial proposal for your approval. This will include an outline specification, giving an overview of your specific build and how much it will cost.

Step 4 - Planning consent & detailed design

Step 4 - Planning consent & detailed design

Once you are happy with our proposal we can prepare the detailed planning application or work with your own team to submit the necessary plans. Once approved our team will work with you to take the scheme through to the final detailed design and contract stage.

Step 5 - Build phase

Step 5 - Build phase

Our experienced project managers set a start and completion date for the handover of the completed project. They are your dedicated point of contact throughout the build, liaising and keeping you up to date with progress.

Step 6 - Post Completion

Step 6 - Post Completion

Once you are up and running and enjoying your new facility we are always available to offer support or advice should you require it.